A Comparative Analysis Between the Tender Estimate and the Actual Completion Cost of High Voltage Fluid Filled Cable Decommissioning

Geraldine Smith, David J. Edwards*, John J. Posillico

*Corresponding author for this work

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

    Original languageEnglish
    Title of host publicationConstruction in 5D
    Subtitle of host publicationDeconstruction, Digitalization, Disruption, Disaster, Development - Proceedings of the 15th Built Environment Conference, 2021
    EditorsTheo C. Haupt, Mariam Akinlolu, Fredrick Simpeh, Christopher Amoah, Zakheeya Armoed
    PublisherSpringer Science and Business Media Deutschland GmbH
    Pages487-503
    Number of pages17
    ISBN (Print)9783030977474
    DOIs
    Publication statusPublished (VoR) - 2023
    Event15th Built Environment Conference, 2021 - Virtual, Online
    Duration: 27 Sept 202128 Sept 2021

    Publication series

    NameLecture Notes in Civil Engineering
    Volume245
    ISSN (Print)2366-2557
    ISSN (Electronic)2366-2565

    Conference

    Conference15th Built Environment Conference, 2021
    CityVirtual, Online
    Period27/09/2128/09/21

    Keywords

    • Actual cost
    • Cable decommissioning
    • Cost uncertainty
    • Fluid filled cable
    • Tender cost
    • Tender estimate
    • Transmission voltage