Skip to main navigation Skip to search Skip to main content

A Lean Six Sigma framework for the reduction of ship loading commercial time in the iron ore pelletising industry

  • Jose Arturo Garza-Reyes*
  • , Mustafa Al-Balushi
  • , Jiju Antony
  • , Vikas Kumar
  • *Corresponding author for this work
    • University of Derby
    • The University of Warwick
    • Heriot-Watt University
    • University of the West of England

    Research output: Contribution to journalArticlepeer-review

    85 Citations (SciVal)
    Original languageEnglish
    Pages (from-to)1092-1111
    Number of pages20
    JournalProduction Planning and Control
    Volume27
    Issue number13
    DOIs
    Publication statusPublished (VoR) - 2 Oct 2016

    Keywords

    • DMAIC
    • iron ore industry
    • lean
    • Lean Six Sigma
    • operations improvement
    • Six Sigma

    Fingerprint

    Dive into the research topics of 'A Lean Six Sigma framework for the reduction of ship loading commercial time in the iron ore pelletising industry'. Together they form a unique fingerprint.

    Cite this