@article{04493f7d96ab44fa9c920b6c7bf8534c,
title = "A method for estimating labour requirements and costs for international construction projects at inception",
keywords = "Cost planning;, In situ concrete construction, International comparison;, Labour resources;, Productivityrates;",
author = "Proverbs, {D. G.} and Holt, {G. D.} and Olomolaiye, {P. O.}",
year = "1998",
month = jan,
day = "1",
doi = "10.1016/s0360-1323(97)00064-4",
language = "English",
volume = "34",
pages = "43--48",
journal = "Building and Environment",
issn = "0360-1323",
publisher = "Elsevier",
number = "1",
}