Automated planning of concrete joint layouts with 4D-BIM

Moslem Sheikhkhoshkar, Farzad Pour Rahimian*, Mohammad Hossein Kaveh, M. Reza Hosseini, David J. Edwards

*Corresponding author for this work

    Research output: Contribution to journalArticlepeer-review

    64 Citations (SciVal)
    Original languageEnglish
    Article number102943
    JournalAutomation in Construction
    Volume107
    DOIs
    Publication statusPublished (VoR) - Nov 2019

    Keywords

    • 4D BIM
    • Concrete scheduling
    • Digital engineering
    • Integrated concrete design
    • Optimisation
    • Structural engineers

    Fingerprint

    Dive into the research topics of 'Automated planning of concrete joint layouts with 4D-BIM'. Together they form a unique fingerprint.

    Cite this