| Original language | English |
|---|---|
| Article number | 102943 |
| Journal | Automation in Construction |
| Volume | 107 |
| DOIs | |
| Publication status | Published (VoR) - Nov 2019 |
Funding
The authors would like to acknowledge the generous International Research Degree Funding received from Teesside University to sponsor PhD study of the first author of this paper, without which it would not be feasible to conduct this research.
Keywords
- 4D BIM
- Concrete scheduling
- Digital engineering
- Integrated concrete design
- Optimisation
- Structural engineers