Early stage multi-level cost estimation for schematic BIM models

Franco K.T. Cheung*, Jonathan Rihan, Joseph Tah, David Duce, Esra Kurul

*Corresponding author for this work

    Research output: Contribution to journalArticlepeer-review

    129 Citations (SciVal)
    Original languageEnglish
    Pages (from-to)67-77
    Number of pages11
    JournalAutomation in Construction
    Volume27
    DOIs
    Publication statusPublished (VoR) - Nov 2012

    Funding

    This research was supported by the Design and Decision Tools for Low Impact Buildings grant (Project No. 400151) from the UK Technology Strategy Board (TSB) and Engineering and Physical Sciences Research Council (EPSRC) . The authors would also like to thank the participating industrial partners of the research project, Best Foot Forward, Zedfactory Ltd., DesignBuilder Software Ltd. and advisor it sO works, for their contribution to the study.

    Keywords

    • 3D CAD
    • BIM
    • Cost model
    • Early stage design
    • NRM

    Fingerprint

    Dive into the research topics of 'Early stage multi-level cost estimation for schematic BIM models'. Together they form a unique fingerprint.

    Cite this