ESTIVATE: A model for calculating excavator productivity and output costs

David J. Edwards, Gary D. Holt

    Research output: Contribution to journalReview articlepeer-review

    41 Citations (SciVal)
    Original languageEnglish
    Pages (from-to)52-62
    Number of pages11
    JournalEngineering, Construction and Architectural Management
    Volume7
    Issue number1
    DOIs
    Publication statusPublished (VoR) - 1 Jan 2000

    Keywords

    • Construction plant
    • Cost estimation
    • Hydraulic excavators
    • Machine cycle time
    • Productivity

    Fingerprint

    Dive into the research topics of 'ESTIVATE: A model for calculating excavator productivity and output costs'. Together they form a unique fingerprint.

    Cite this