Modelling the magnitude of plant downtime: A tool for improving plant operations management

David J. Edwards, Silas Yisa

    Research output: Contribution to journalReview articlepeer-review

    5 Citations (Scopus)
    Original languageEnglish
    Pages (from-to)225-232
    Number of pages8
    JournalEngineering, Construction and Architectural Management
    Volume8
    Issue number3
    DOIs
    Publication statusPublished (VoR) - 1 Mar 2001

    Keywords

    • Breakdown duration
    • Linear interpolation
    • Plant operations management
    • Probability
    • Stochastic random numbers
    • Tracked hydraulic excavators

    Fingerprint

    Dive into the research topics of 'Modelling the magnitude of plant downtime: A tool for improving plant operations management'. Together they form a unique fingerprint.

    Cite this