| Original language | English |
|---|---|
| Journal | Journal of Engineering, Design and Technology |
| DOIs | |
| Publication status | Published (VoR) - 8 Mar 2022 |
Keywords
- Ghana
- PPP
- Power projects
- Private sector
- Public sector
- Public–private partnership (PPP)
- Reasons
Augustine Senanu Komla Kukah*, De Graft Owusu-Manu, Edward Badu, David John Edwards
Research output: Contribution to journal › Article › peer-review
| Original language | English |
|---|---|
| Journal | Journal of Engineering, Design and Technology |
| DOIs | |
| Publication status | Published (VoR) - 8 Mar 2022 |